Submit rig MF

Phigit Class Site Arachnid Chine Hull Request registration View hull reg requests Submit boat MF View boat MFs Submit rig MF View rig MFs Request New Ownership View owner changes Submit event entry form View event entries


PHIGIT CLASS                                                                 2006

RIG/SAIL MEASUREMENT FORM

Authority:  Class Management Group

Hull Registration Number:       Format: Three-letter country code, space, number

RIGS AND ITS SAILS MEASURED (check as appropriate)

 
 
Rig 1
Yes   No
Rig 2
Yes   No
Rig 3
Yes   No
   

GENERAL NOTES

1 Measurements shall be carried out in accordance with the Equipment Rules of Sailing except where varied in the class rules.

2 The boat shall comply with all the relevant class rules even if some of the rules are not mentioned on the measurement form(s).

3 This measurement form may be used for up to three rigs and its sails.  Check the numbers above for rigs and its sails which have been measured.  Leave unchecked the numbers for rigs which have not been measured.

4 To have more rigs and its sails added to the certificate the owner shall complete a new rig/sail measurement form. The rig/sail measurement form, together with any re-certification fee that may be required and the current certificate, shall be sent to the CMG.

PARTS

1 F.1.1 Does any rig comprise more than one mast?
Yes   No

MAST

2

F.1.1

Is the lower point to upper point dimension correct?
rig 1 1600 mm max      rig 2 1180 mm max      rig 3 880 mm max

Yes   No

3

F.1.1

Is the lower edge of the headsail stay limit mark at the foreside of the spar to the upper point dimension correct?
rig 1 220 mm min      rig 2 160 mm min     rig 3 120 mm min

Yes   No

4

F.1.1

Is the width of all limit marks between 3 and 10 mm?

Yes   No

MAINSAILS

5

G.1.2

State whether the sail(s) have been certified by a manufacturer approved by the CMG, or by an official measurer following completion of an IOM measurement form (if the sail(s) have been certified by an official measurer, retain the completed measurement form for an equipment inspector):

   

Rig 1

Approved manufacturer
Official measurer
N/A
   

Rig 2

Approved manufacturer
Official measurer
N/A
   

Rig 3

Approved manufacturer
Official measurer
N/A

HEADSAILS

6 G.1.2 State whether the sail(s) have been certified by a manufacturer approved by the CMG, or by an official measurer following completion of an IOM measurement form (if the sail(s) have been certified by an official measurer, retain the completed measurement form for an equipment inspector):
    Rig 1
Approved manufacturer
Official measurer
N/A
    Rig 2
Approved manufacturer
Official measurer
N/A
    Rig 3
Approved manufacturer
Official measurer
N/A

DECLARATION BY THE OWNER

The information provided on this form is true and accurate.  I undertake to maintain these rigs and sails in compliance with the class rules.

Signature  

(Any text entry in the 'Signature' field confirms Owner's declaration and undertaking.)

COMMENTS

If the owner has any doubt concerning the application of, or compliance of any part of the boat with, the class rules he shall report it on the measurement form(s) before sending them to the certification authority and not sign measurement form(s).

 


©2007 Lester Gilbert